Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Carrefour I & II Blvd. Royal Luxembourg-Ville Haute | office building, refurbishment | metal panel, jointless drywall ceiling with CTM placed on top | Luxembourg, Luxemburg-Ville Haute | Architect: M3 Architectes Client: Fonds de Compensation Luxembourg |
7.150 m² | 2016 - 2017 | |
BVA buildings Josefstädter Str. 76-78 Vienna | office building, refurbishment | metal panel, gypsum board wall with CTM, special design | Austria, Vienna | 1.801 m² | 2015 - 2017 | ||
Showrooms Office Tabuk | office building, new construction | plaster on gypsum board, jointless drywall ceiling with CTM placed on top, gypsum board wall with OPTIPANEL 15, GRAVIMAT | Saudi Arabia, Tabuk | 110 m² | 2012 | ||
Showrooms Office Riyadh | office building | GRAVIMAT, plaster on gypsum board, plaster on concrete, gypsum board wall with OPTIPANEL 18, floor heating onto screed, wooden or drywall subfloor | Saudi Arabia, Riad | 420 m² | 2013 | ||
Daimler AG building 136 Werk Untertürkheim | office building, refurbishment | gypsum board ceiling tile, jointless drywall ceiling with CTM placed on top, gypsum board wall with CTM | Germany, Stuttgart | 203 m² | 2016 |