Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Casa Salute Headquater Südtirol | office building, new construction | Deckenheizung und -kühlung im Lehmputz, Lehmputz | Italy, Margreid / South-Tirol | Architect: M7 Architecture+Design, Marco Sette Client: Casa Salute, Magré |
178 m² | 2012 | |
Carrefour I & II Blvd. Royal Luxembourg-Ville Haute | office building, refurbishment | metal panel, jointless drywall ceiling with CTM placed on top | Luxembourg, Luxemburg-Ville Haute | Architect: M3 Architectes Client: Fonds de Compensation Luxembourg |
7.150 m² | 2016 - 2017 | |
Office building Roussos Bros Thessaloniki | office building | plaster on gypsum board, brickwork, concrete, plaster on concrete, floor heating in screed | Greece, Thessaloniki | 618 m² | 2008 | ||
BVA buildings Josefstädter Str. 76-78 Vienna | office building, refurbishment | metal panel, gypsum board wall with CTM, special design | Austria, Vienna | 1.801 m² | 2015 - 2017 | ||
Showrooms Office Tabuk | office building, new construction | plaster on gypsum board, jointless drywall ceiling with CTM placed on top, gypsum board wall with OPTIPANEL 15, GRAVIMAT | Saudi Arabia, Tabuk | 110 m² | 2012 | ||
Showrooms Office Riyadh | office building | GRAVIMAT, plaster on gypsum board, plaster on concrete, gypsum board wall with OPTIPANEL 18, floor heating onto screed, wooden or drywall subfloor | Saudi Arabia, Riad | 420 m² | 2013 | ||
Villa Büchl KG Münster | office building | floor heating onto screed, wooden or drywall subfloor, plaster on gypsum board, brickwork, concrete | Germany, Muenster | 368 m² | 2011 | ||
Daimler AG building 136 Werk Untertürkheim | office building, refurbishment | gypsum board ceiling tile, jointless drywall ceiling with CTM placed on top, gypsum board wall with CTM | Germany, Stuttgart | 203 m² | 2016 | ||
Von Ardenne GmbH Dresden | New Construction | office building, new construction | plaster on concrete, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top | Germany, Dresden | 1.423 m² | 2013 - 2014 | ||
Office Greenwell Design & Build Cairo | office building, refurbishment | plaster on concrete, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top, GRAVIMAT | Egypt, Cairo | Client: Greenwell Design & Build |
123 m² | 2022 |