Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Office Iberian Cosmetic Trading | Calpe | office building, refurbishment | plaster on gypsum board, GRAVIMAT | Spain, Calpe | 213 m² | 2004 | ||
Office building "KST Klimasystemtechnik" Shanghai | office building | room element, metal panel, cooling roll, cooling column, GRAVIMAT | China, Shanghai | Client: KST Klimasystemtechnik Co. Ltd. |
2.386 m² | 2007 | |
KST cooling convector | office building | GRAVIMAT | China, Kunshan | 280 m² | 2018 | ||
Delegation of the EU to Georgia I Tbilisi | office building, refurbishment | GRAVIMAT, plaster on gypsum board | Georgia, Tbilisi | Client: European Union |
802 m² | 2004 & 2007 | |
Delegation of the EU to Georgien II Tbilisi | office building, refurbishment | floor heating onto screed, wooden or drywall subfloor, GRAVIMAT | Georgia, Tbilisi | Client: European Union |
271 m² | 2010 & 2020 | |
Showrooms Office Tabuk | office building, new construction | plaster on gypsum board, jointless drywall ceiling with CTM placed on top, gypsum board wall with OPTIPANEL 15, GRAVIMAT | Saudi Arabia, Tabuk | 110 m² | 2012 | ||
Office Riyadh | office building | GRAVIMAT | Saudi Arabia, Riad | 80 m² | 2018 | ||
Showrooms Office Riyadh | office building | GRAVIMAT, plaster on gypsum board, plaster on concrete, gypsum board wall with OPTIPANEL 18, floor heating onto screed, wooden or drywall subfloor | Saudi Arabia, Riad | 420 m² | 2013 | ||
Taiba Gold & Jewels Dubai | office building | GRAVIMAT, jointless gypsum board ceiling with OPTIPANEL 15 | United Arab Emirates, Dubai | 488 m² | 2015 | ||
Deutsche Telekom Representative Office Berlin | office building, new construction , , refurbishment | metal panel, jointless drywall ceiling with CTM placed on top, GRAVIMAT | Germany, Berlin | 1.980 m² | 2001 | ||
Volksbank Mindener Land Minden | office building, refurbishment | metal panel, jointless drywall ceiling with CTM placed on top, GRAVIMAT | Germany, Minden | 1.980 m² | 2012 & 2014 | ||
Kreissparkasse Halle Westfalen | Savings Bank | office building | jointless drywall ceiling with CTM placed on top, GRAVIMAT | Germany, Halle (Westfalen) | 1.717 m² | 2010-2011 | ||
Landwirtschaftsamt Leinefelde | office building | GRAVIMAT | Germany, Leinefelde | 63 m² | |||
Capricornhaus | E.ON Energy Trading Düsseldorf | office building, new construction | jointless drywall ceiling with CTM placed on top, GRAVIMAT | Germany, Düsseldorf | Architect: Gatermann + Schossig |
70 m² | 2008 | |
E.ON AG Düsseldorf | office building, refurbishment | plaster on gypsum board, plaster on concrete, GRAVIMAT | Germany, Düsseldorf | Architect: Oswald Matthias Ungers |
1.211 m² | 2007 - 2008 | |
Stadtwerke Herne | Municipal Utilities | office building | jointless gypsum board ceiling with OPTIPANEL 18, GRAVIMAT | Germany, Herne | 247 m² | 2011 | ||
Westfälische Provinzial Versicherung | Insurance Münster | office building | jointless drywall ceiling with CTM placed on top, GRAVIMAT | Germany, Muenster | 258 m² | 2010 - 2011 | ||
Serverroom Company Dieker Garrel | office building | GRAVIMAT | Germany, Garrel | 70 m² | 2010 | ||
DKV Krankenversicherung | Health Insurance Cologne | office building | GRAVIMAT | Germany, Cologne | 283 m² | 2001 | ||
Schäfer Werke Neunkirchen | office building | GRAVIMAT | Germany, Neunkirchen | 129 m² | 2008 | ||
Umweltamt Sondershausen | Environment Agency | office building, refurbishment | plaster on concrete, floor heating in screed, GRAVIMAT | Germany, Sondershausen | 1.696 m² | 2003 - 2004 & 2006 - 2007 & 2011 | ||
Office Greenwell Design & Build Cairo | office building, refurbishment | plaster on concrete, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top, GRAVIMAT | Egypt, Cairo | Client: Greenwell Design & Build |
123 m² | 2022 |