Project title Building type Heating and cooling system Location Architect/Client CTM surface Year
CIPA "Grengewald" Assisted Living Nideranven social and medical institutions jointless drywall ceiling with CTM placed on top Luxembourg, Niederanven 119 m² 2006 - 2007
Medical Center - Fondation Norbert Metz Luxembourg-Eich social and medical institutions jointless drywall ceiling with CTM placed on top Luxembourg, Luxembourg-Eich 1.206 m² 2007 - 2008
Bethesda Ärztezentrum | Medical Centre Mönchengladbach social and medical institutions, new construction gypsum board ceiling tile, jointless drywall ceiling with CTM placed on top Germany, Mönchengladbach

Architect: Ledwig + Spinnen

3.880 m² 2013 & 2014
Maison de Soins St. François Clervaux social and medical institutions, refurbishment jointless drywall ceiling with CTM placed on top Luxembourg, Clerf 315 m² 2009 & 2018
Medici-Ärztehaus | Medical Centre Mönchengladbach social and medical institutions, new construction jointless drywall ceiling with CTM placed on top, floor heating in screed Germany, Mönchengladbach 1.749 m² 2009
Retirement home Sunrise Villa Camphausen Bonn social and medical institutions, refurbishment jointless drywall ceiling with CTM placed on top, GRAVIMAT Germany, Bonn 1.112 m² 2005