Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
DOSB Deutscher Olympischer Sport Bund Frankfurt am Main | office building, new construction and refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Frankfurt/Main | Architect: HPP Architekten Düsseldorf |
1.867 m² | 2015 - 2016 | |
Frankfurter Welle Frankfurt am Main | office building, new construction | jointless drywall ceiling with CTM placed on top | Germany, Frankfurt/Main | Architect: JSK SIAT Architekten und Ingenieure GmbH |
1.436 m² | 2002 - 2006 | |
Office building Bockheimer Landstr. 94-96 Frankfurt am Main | office building, refurbishment | plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Frankfurt/Main | 1.058 m² | 2006 | ||
Residential building Wasserweg 17 Frankfurt am Main | residential building, refurbishment | floor heating in screed, jointless drywall ceiling with CTM placed on top | Germany, Frankfurt/Main | 296 m² | 2021 bis | ||
Sheraton Hotel Airport Frankfurt am Main | hotel | jointless drywall ceiling with CTM placed on top | Germany, Frankfurt/Main | 55 m² | 2008 |