Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Frauenkirche in Meißen | Church | public building, refurbishment | plaster on gypsum board, brickwork, concrete, plaster on concrete, floor heating in screed | Germany, Meißen | Architect: Architekturbüro Jürgen Singer |
304 m² | 2013 | |
Von Ardenne GmbH Dresden | New Construction | office building, new construction | plaster on concrete, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top | Germany, Dresden | 1.423 m² | 2013 - 2014 | ||
Calyxo Thalheim | industrial building, new construction | plaster on gypsum board, brickwork, concrete | Germany, Thalheim | Architect: bhss architekten gmbh |
328 m² | 2007 |