Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
New construction Mikroskopgebäude SALVE + TITAN Ulm | laboratory, new construction | gypsum board ceiling tile, gypsum board wall with OPTIPANEL 18 | Germany, Ulm | Architect: Mühlich, Finke & Partner Client: Vermögen und Bau Baden-Württemberg |
216 m² | 2017 | |
Roche Laboratory Amadora | laboratory | jointless drywall ceiling with CTM placed on top | Portugal, Amadora | 857 m² | 2004 | ||
ICHV Sion | Institute Central Des Hôpitaux Sion | laboratory, refurbishment | jointless drywall ceiling with CTM placed on top | Switzerland, Sitten | 161 m² | 2019 | ||
Cell-based therapy Dr.Neßelhut | Oncology Centre Duderstadt | laboratory | gypsum board ceiling tile, jointless gypsum board ceiling with OPTIPANEL 15 | Germany, Duderstadt | 349 m² | 2011 | ||
Fraunhofer Institute for Silicate Research ISC Würzburg | laboratory | jointless gypsum board ceiling with OPTIPANEL 25 | Germany, Würzburg | 313 m² | 2012 |