Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Barnhoorn Rijssenhout Villa | residential building, new construction | ground collector, near-surface concrete activation, plaster on gypsum board | Netherlands, Rijsenhout | 1.448 m² | 2015 - 2016 | ||
Residential Speelpolder Hooge Nesse | ground collector Zwijndrecht | residential building | ground collector | Netherlands, Zwijndrecht | 192 m² | 2020 | ||
Fundación Victor Sastre El Barraco Avila | public building | ground collector, floor heating in screed, jointless drywall ceiling with CTM placed on top | Spain, El Barraco Avila | Client: Privatperson |
303 m² | 2010 - 2011 | |
Dialyse Centre Berlin | social and medical institutions, refurbishment | ground collector | Germany, Berlin | 240 m² | 2003 | ||
Hofgebäude Brunnenstrasse Berlin | residential building, new construction | floor heating in screed, jointless gypsum board ceiling with OPTIPANEL 15, roof absorber, ground collector | Germany, Berlin | Architect: Cubus Plan GmbH Client: private person |
251 m² | 2015 | |
Single-family house Negast | residential building, new construction | ground collector | Germany, Negast | 160 m² | 2011 | ||
Altin ground collector Lübeck | residential building | ground collector | Germany, Lübeck | 176 m² | 2010 & 2011 | ||
Kulturwerft Gollan Lübeck | industrial building, refurbishment | ground collector | Germany, Lübeck | 128 m² | |||
Residential building Römerweg Stelzenberg | residential building | ground collector | Germany, Stelzenberg | 160 m² | 2020 |