Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Bleesbrueck Purification Plant | industrial building, refurbishment | heat exchanger | Luxembourg, Bettendorf | 1.345 m² | 2017 - 2018 | ||
Barnhoorn Rijssenhout Villa | residential building, new construction | ground collector, near-surface concrete activation, plaster on gypsum board | Netherlands, Rijsenhout | 1.448 m² | 2015 - 2016 | ||
Ice storage single family house FA Maishofen | residential building | ice storage, wall absorber | Austria, Maishofen | 503 m² | 2012 | ||
Residential building MEI Maishofen | residential building, new construction | ice storage, facade absorber, wall absorber | Austria, Maishofen | Architect: Architektur Kessler |
80 m² | 2015 | |
Exhaust air heat exchanger Conti tyre plant Hannover | industrial building, retrofit | heat exchanger | Germany, Hannover | 472 m² | 2008 | ||
Heat recovery waste water plant Münster | industrial building | heat exchanger | Germany, Muenster | 62 m² | 2015 | ||
Single family home with swimming pool Gars am Inn | residential building, new construction | jointless gypsum board ceiling with OPTIPANEL 15, floor heating in screed, surface collector, facade absorber | Germany, Gars am Inn | Client: private person |
746 m² | 2016 | |
WHZ | Heat Exchanger in mine drainage water Zwickau | public building | heat exchanger | Germany, Zwickau | 528 m² | 2017 | ||
heat recovery from a stable Gera | industrial building, retrofit | heat exchanger | Germany, Gera | 44 m² | 2008 | ||
Residential Speelpolder Hooge Nesse | ground collector Zwijndrecht | residential building | ground collector | Netherlands, Zwijndrecht | 192 m² | 2020 | ||
Absorber residential building RI-RA Maishofen | residential building, new construction | facade absorber | Austria, Maishofen | 82 m² | 2013 | ||
Residential building Rieder Beton Fibre C Active Skin Maishofen | residential building | facade absorber | Austria, Maishofen | 438 m² | 2013 - 2014 | ||
Chalet Alpenrose Ramsau | hotel, refurbishment | facade absorber, wall absorber, ice storage | Austria, Ramsau | 153 m² | 2013 | ||
Fundación Victor Sastre El Barraco Avila | public building | ground collector, floor heating in screed, jointless drywall ceiling with CTM placed on top | Spain, El Barraco Avila | Client: Privatperson |
303 m² | 2010 - 2011 | |
dewatering sewage sludge Bucheon-si | industrial building | heat exchanger | South Korea, Bucheon-si | 2.084 m² | 2017 | ||
Dialyse Centre Berlin | social and medical institutions, refurbishment | ground collector | Germany, Berlin | 240 m² | 2003 | ||
Hofgebäude Brunnenstrasse Berlin | residential building, new construction | floor heating in screed, jointless gypsum board ceiling with OPTIPANEL 15, roof absorber, ground collector | Germany, Berlin | Architect: Cubus Plan GmbH Client: private person |
251 m² | 2015 | |
Single-family house Negast | residential building, new construction | ground collector | Germany, Negast | 160 m² | 2011 | ||
Altin ground collector Lübeck | residential building | ground collector | Germany, Lübeck | 176 m² | 2010 & 2011 | ||
Kulturwerft Gollan Lübeck | industrial building, refurbishment | ground collector | Germany, Lübeck | 128 m² | |||
Residential building Römerweg Stelzenberg | residential building | ground collector | Germany, Stelzenberg | 160 m² | 2020 |