Project title Building type Heating and cooling system Location Architect/Client CTM surface Year
CIPA "Grengewald" Assisted Living Nideranven social and medical institutions jointless drywall ceiling with CTM placed on top Luxembourg, Niederanven 119 m² 2006 - 2007
Medical Center - Fondation Norbert Metz Luxembourg-Eich social and medical institutions jointless drywall ceiling with CTM placed on top Luxembourg, Luxembourg-Eich 1.206 m² 2007 - 2008
CHEM Centre Hospitalier Emile Mayrisch Esch-sur-Alzette clinic, refurbishment metal panel, jointless drywall ceiling with CTM placed on top, plaster on gypsum board, brickwork, concrete Luxembourg, Esch-sur-Alzette

Architect: Jim Clemes Associates

999 m² 2008 - 2011 & 2014
Carrefour I & II Blvd. Royal Luxembourg-Ville Haute office building, refurbishment metal panel, jointless drywall ceiling with CTM placed on top Luxembourg, Luxemburg-Ville Haute

Architect: M3 Architectes

Client: Fonds de Compensation Luxembourg

7.150 m² 2016 - 2017
Hôpital Kirchberg Luxembourg-Kirchberg clinic jointless drywall ceiling with CTM placed on top Luxembourg, Luxembourg-Kirchberg 212 m² 2020
Cloitre St. Francois Luxury Apartments residential building jointless drywall ceiling with CTM placed on top Luxembourg, Luxemburg 1.010 m² 2017 - 2019
Maison Kurt Luxembourg residential building jointless drywall ceiling with CTM placed on top Luxembourg, Luxemburg 224 m² 2018
Law office Loyens & Loeff Luxembourg-Neudorf/Weimershof office building jointless drywall ceiling with CTM placed on top Luxembourg, Luxembourg-Neudorf/Weimersdorf 141 m² 2017
Rocade de Bonnevoie | Dairy House Luxembourg-Gare office building, new construction jointless drywall ceiling with CTM placed on top Luxembourg, Luxembourg-Gare

Architect: Ricardo Bertoni

801 m² 2008
Maison de Soins St. François Clervaux social and medical institutions, refurbishment jointless drywall ceiling with CTM placed on top Luxembourg, Clerf 315 m² 2009 & 2018
Mairie deBertrange| townhall public building jointless drywall ceiling with CTM placed on top Luxembourg, Bertrange 529 m² 2010
New town hall | Mondorf-les-Bains public building, new construction plaster on concrete, jointless drywall ceiling with CTM placed on top Luxembourg, Mondorf-les-Bains

Architect: Coeba architecture, urbanisme & design, Bereldange, Luxemburg

810 m² 2011
CPU Jail Ürschterhaff Sanem public building, new construction jointless drywall ceiling with CTM placed on top Luxembourg, Sanem 195 m² 2019