Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Concorde Hotel London | hotel, refurbishment | plaster on gypsum board | United Kingdom, London | 69 m² | 2008 | ||
Wellington Hotel, Westminster London | hotel, refurbishment | plaster on gypsum board | United Kingdom, London | 300 m² | 2013 | ||
Hotel Muchele Wine tasting Meran | hotel | plaster on gypsum board, plaster on gypsum board, brickwork, concrete | Italy, Burgstall / Meran | Architect: Architekten Marx/Ladurner Client: Hotel Muchele KG, Burgstall/Meran |
58 m² | 2015 | |
Hotel Landgoed Zonheuvel and Conference Center Doorn | hotel | near-surface concrete activation, plaster on gypsum board, plaster on concrete | Netherlands, Doorn | 1.125 m² | 2010 | ||
Hotel Sans Souci Vienna | hotel, refurbishment | plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top | Austria, Vienna | 963 m² | 2012 | ||
Leninsk Hotel | hotel, new construction | plaster on gypsum board, GRAVIMAT | Russia, Leninsk | 796 m² | 2018 | ||
Hotel HASA Prague | hotel, refurbishment | plaster on gypsum board | Czech Republic, Prague | 264 m² | 2010 | ||
Hotel Iveria Inn Tbilisi | hotel | plaster on gypsum board | Georgia, Tbilisi | 512 m² | 2008 | ||
Maison Duyck | Hotel Brussels | hotel, refurbishment | plaster on gypsum board, acoustic plaster ceiling BASWA Cool | Belgium, Brussels | Architect: Bureau d'Architecture Philippe Cuylits Client: M. et Mme Duyck-De Lathauwer |
369 m² | 2015 | |
Hotel Neuvice Liège | hotel, refurbishment | plaster on gypsum board, plaster on gypsum board, brickwork, concrete, floor heating in screed, floor heating onto screed, wooden or drywall subfloor | Belgium, Liege | Architect: Bureau d'Architectes Stéphane Adam - Michaël Hick Client: Société HÔTEL NEUVICE |
349 m² | 2012 | |
art'otel Berlin Berlin | hotel, new construction | plaster on gypsum board, plaster on concrete | Germany, Berlin | 726 m² | 2001 | ||
Grand Spa Resort A-Rosa Sylt | hotel | plaster on gypsum board | Germany, List | Sylt | 364 m² | 2009 | ||
Me and all Lindner Hotel Düsseldorf | hotel, new construction and refurbishment | plaster on gypsum board | Germany, Düsseldorf | Architect: gna Grimbacher Nogales Architekten GmbH |
2.728 m² | 2015 - 2016 | |
Stadthaus am Gürzenich Cologne | hotel, new construction | plaster on gypsum board, plaster on concrete | Germany, Cologne | Architect: Architekten Waclaw Bieniasz-Nicholson und John Seifert |
1.082 m² | 2002 - 2003 | |
Parkhotel Quellenhof Aachen (I + II.BA) | hotel | plaster on gypsum board, plaster on concrete | Germany, Aachen | 748 m² | 1999 - 2001 | ||
Schloss Waldthausen Budenheim | Castle | hotel, refurbishment | plaster on gypsum board | Germany, Budenheim | 120 m² | 2002 | ||
Diehl's Hotel Rheinterrassen Koblenz | hotel, refurbishment | plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Koblenz | 420 m² | 2000 | ||
Hotel Schlockhoff Hattersheim | hotel | plaster on gypsum board | Germany, Hattersheim | 506 m² | 2003 |