Project title Building type Heating and cooling system Location Architect/Client CTM surface Year
Hotel Im Wasserturm | Hotel in water tower Hamburg hotel, refurbishment plaster on concrete Germany, Hamburg

Architect: Falk von Tettenborn

2.658 m² 2006 Wasserturm aus rotem Backstein mit achteckigem Spitzdach im Park
Hotel Van der Valk Eemnes hotel, new construction near-surface concrete activation Netherlands, Eemnes 741 m² 2010
Belsen Parkhotel Düsseldorf-Oberkassel hotel, new construction plaster on concrete Germany, Düsseldorf

Architect: AJF und Partner

Client: CB Oberkassel GmbH

2.375 m² 2018 - 2020
Parkhotel Bad Aibling hotel, refurbishment plaster on gypsum board, brickwork, concrete, floor heating in screed Germany, Bad Aibling

Architect: Dipl.-Ing. Henner Oppermann

732 m² 2008
Gutshaus Neuendorf | Usedom hotel, refurbishment plaster on gypsum board, brickwork, concrete Germany, Lütow

Client: Ziegler

623 m² 2004
Royal Olympic Hotel Athen hotel, refurbishment floor heating in screed Greece, Athens

Client: private person

430 m² 2007
Core Resorts Hotel Polichrono Chalkidiki hotel jointless drywall ceiling with CTM placed on top Greece, Chalkidiki

Client: Core Hotels Ltd

87 m² 2011
Concorde Hotel London hotel, refurbishment plaster on gypsum board United Kingdom, London 69 m² 2008
Wellington Hotel, Westminster London hotel, refurbishment plaster on gypsum board United Kingdom, London 300 m² 2013
Maids Head Hotel Norwich hotel, refurbishment plaster on concrete United Kingdom, Norwich 913 m² 2014 - 2016
Hotel Muchele Wine tasting Meran hotel plaster on gypsum board, plaster on gypsum board, brickwork, concrete Italy, Burgstall / Meran

Architect: Architekten Marx/Ladurner

Client: Hotel Muchele KG, Burgstall/Meran

58 m² 2015
Hotel Landgoed Zonheuvel and Conference Center Doorn hotel near-surface concrete activation, plaster on gypsum board, plaster on concrete Netherlands, Doorn 1.125 m² 2010
Zorghotel De Nieuwe Basis Doorn hotel near-surface concrete activation Netherlands, Doorn 1.117 m² 2012 - 2013
Hotel Sans Souci Vienna hotel, refurbishment plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top Austria, Vienna 963 m² 2012
Vienna Marriott Hotel hotel jointless drywall ceiling with CTM placed on top Austria, Vienna 188 m² 2014
Chalet Alpenrose Ramsau hotel, refurbishment facade absorber, wall absorber, ice storage Austria, Ramsau 153 m² 2013
Grand Hotel Balvanyos hotel plaster on concrete, floor heating in screed Romania, Balvanyos 1.033 m² 2014 - 2015
Spa and Hotel Lobogo Homorod hotel plaster on concrete, floor heating onto screed, wooden or drywall subfloor Romania, Hamruden 360 m² 2017
Leninsk Hotel hotel, new construction plaster on gypsum board, GRAVIMAT Russia, Leninsk 796 m² 2018
Hotel Elite Biel hotel jointless drywall ceiling with CTM placed on top Switzerland, Biel 135 m² 2005
Hotel HASA Prague hotel, refurbishment plaster on gypsum board Czech Republic, Prague 264 m² 2010
Superior Hotel Löverek Sopran hotel plaster on concrete Hungary, Sopran 455 m² 2005
Bal Harbour Hotel Miami Beach hotel jointless drywall ceiling with CTM placed on top, floor heating in screed USA, Miami Beach, FL 344 m² 2010
Hotel Iveria Inn Tbilisi hotel plaster on gypsum board Georgia, Tbilisi 512 m² 2008
Dubai World Islands Dubai hotel, new construction GRAVIMAT United Arab Emirates, Dubai 200 m² 2016
Maison Duyck | Hotel Brussels hotel, refurbishment plaster on gypsum board, acoustic plaster ceiling BASWA Cool Belgium, Brussels

Architect: Bureau d'Architecture Philippe Cuylits

Client: M. et Mme Duyck-De Lathauwer

369 m² 2015
Hotel Neuvice Liège hotel, refurbishment plaster on gypsum board, plaster on gypsum board, brickwork, concrete, floor heating in screed, floor heating onto screed, wooden or drywall subfloor Belgium, Liege

Architect: Bureau d'Architectes Stéphane Adam - Michaël Hick

Client: Société HÔTEL NEUVICE

349 m² 2012
art'otel Berlin Berlin hotel, new construction plaster on gypsum board, plaster on concrete Germany, Berlin 726 m² 2001
Hotel "ADREMA", Extension Berlin hotel, new construction plaster on concrete Germany, Berlin

Architect: PLAN 7 Architekten

1.058 m² 2004 - 2006
Old Village School Triebkendorf hotel, refurbishment floor heating in screed Germany, Feldberger Seenlandschaft OT Triebkendorf 371 m² 2008
Grand Hotel Heilgendamm Bad Doberan hotel, refurbishment plaster on concrete Germany, Bad Doberan 866 m² 2002 - 2003
Grandhotel THE FONTENAY Hamburg hotel, new construction jointless gypsum board ceiling with OPTIPANEL 18 Germany, Hamburg

Architect: Störmer Murphy and Partners GbR

Client: Kühne Immobilia GmbH, Hamburg

2.120 m² 2016 - 2017
Scandic Emporio Hotel Hamburg hotel, new construction jointless drywall ceiling with CTM placed on top Germany, Hamburg

Architect: Axel Bühring Architekturbüro

39 m² 2016
Westin Hotel in the Elbphilharmonie Hamburg hotel, new construction jointless gypsum board ceiling with OPTIPANEL 15 Germany, Hamburg

Architect: Herzog & de Meuron

4.100 m² 2010 & 2014
Grand Spa Resort A-Rosa Sylt hotel plaster on gypsum board Germany, List | Sylt 364 m² 2009
The Ritz-Carlton in the "VW Autostadt" Wolfsburg hotel acoustic plaster ceiling BASWA Cool Germany, Wolfsburg 214 m² 2013
Gutshof Elbschloss Kehnert Tangerhütte hotel, refurbishment floor heating in screed, jointless drywall ceiling with CTM placed on top Germany, Tangerhütte 94 m² 2021
Me and all Lindner Hotel Düsseldorf hotel, new construction and refurbishment plaster on gypsum board Germany, Düsseldorf

Architect: gna Grimbacher Nogales Architekten GmbH

2.728 m² 2015 - 2016
Themenhotel Phantasialand Brühl hotel plaster on concrete Germany, Brühl 30 m² 2003
Stadthaus am Gürzenich Cologne hotel, new construction plaster on gypsum board, plaster on concrete Germany, Cologne

Architect: Architekten Waclaw Bieniasz-Nicholson und John Seifert

1.082 m² 2002 - 2003
Parkhotel Quellenhof Aachen (I + II.BA) hotel plaster on gypsum board, plaster on concrete Germany, Aachen 748 m² 1999 - 2001
Schloss Waldthausen Budenheim | Castle hotel, refurbishment plaster on gypsum board Germany, Budenheim 120 m² 2002
Diehl's Hotel Rheinterrassen Koblenz hotel, refurbishment plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top Germany, Koblenz 420 m² 2000
Sheraton Hotel Airport Frankfurt am Main hotel jointless drywall ceiling with CTM placed on top Germany, Frankfurt/Main 55 m² 2008
New Century Hotel Offenbach hotel jointless gypsum board ceiling with OPTIPANEL 18 Germany, Offenbach 1.030 m² 2016
Hotel Schlockhoff Hattersheim hotel plaster on gypsum board Germany, Hattersheim 506 m² 2003
Lindner Hotel Speyer hotel plaster on concrete Germany, Speyer 107 m² 2004
Dorint-Hotel Baden-Baden hotel jointless drywall ceiling with CTM placed on top Germany, Baden-Baden 319 m² 2001