Project title Building type Heating and cooling system Location Architect/Client CTM surface Year
Herz- u. Diabeteszentrum NRW new construction Bad Oeynhausen clinic, new construction plaster on gypsum board, plaster on concrete, floor heating in screed Germany, Bad Oeynhausen

Architect: agn Niederberghaus & Partner GmbH

1.453 m² 2011 - 2012
Herz- u. Diabeteszentrum NRW remodelling Bad Oeynhausen clinic, refurbishment plaster on gypsum board Germany, Bad Oeynhausen

Architect: agn Niederberghaus & Partner GmbH

3.148 m² 2013 - 2018
Bankhaus Lampe Bielefeld public building, new construction and refurbishment plaster on concrete Germany, Bielefeld

Architect: agn Niederberghaus & Partner GmbH

Client: Lampe Immobilien GmbH & Co. KG

360 m² 2019
Belsen Parkhotel Düsseldorf-Oberkassel hotel, new construction plaster on concrete Germany, Düsseldorf

Architect: AJF und Partner

Client: CB Oberkassel GmbH

2.375 m² 2018 - 2020
Grey Campus Düsseldorf office building, refurbishment , , new construction plaster on concrete Germany, Düsseldorf

Architect: pinkarchitektur

3.647 m² 2007 - 2008
Bethesda Ärztezentrum | Medical Centre Mönchengladbach social and medical institutions, new construction gypsum board ceiling tile, jointless drywall ceiling with CTM placed on top Germany, Mönchengladbach

Architect: Ledwig + Spinnen

3.880 m² 2013 & 2014
Contex Präzisionstechnik Mönchengladbach industrial building, refurbishment metal floating ceiling Germany, Mönchengladbach

Architect: Wechselberger Bau- und Planungsgesellschaft mbH

Client: Meels - Brunnen GbR - 2

141 m² 2016
Vollkornmühle & Bäckerei Myska | Bakery Wuppertal industrial building, modification floor heating in screed Germany, Wuppertal

Architect: IfBW GmbH, Wuppertal

Client: private person

1.184 m² 2014 & 2018
New construction RWE Trading Floor Essen office building, new construction plaster on gypsum board, plaster on concrete, metal panel Germany, Essen

Architect: Kaspar Kraemer Architekten GmbH

7.360 m² 2008 - 2010
ThyssenKrupp Quartier Essen office building, new construction plaster on gypsum board, plaster on concrete Germany, Essen

Architect: JSWD Architekten GmbH & Co. KG und Chaix & Morel et Associés

15.125 m² 2009 - 2010
New office building Schauinsland-Reisen Duisburg office building, new construction plaster on concrete, metal panel, jointless gypsum board ceiling with OPTIPANEL 25 Germany, Duisburg

Client: Schauinsland-Reisen

2.576 m² 2017
Heat recovery waste water plant Münster industrial building heat exchanger Germany, Muenster 62 m² 2015
EuroNova Loftmeile | Building 3, 4, 6 Cologne office building, new construction jointless drywall ceiling with CTM placed on top Germany, Cologne 857 m² 2010 - 2012
RheinEnergie AG main building Cologne office building, new construction plaster on concrete, metal panel, jointless drywall ceiling with CTM placed on top, jointless gypsum board ceiling with OPTIPANEL 18 Germany, Cologne

Architect: Sinning Architekten

29.400 m² 2012 - 2014
Rheinpalais Cologne office building, new construction and refurbishment jointless drywall ceiling with CTM placed on top Germany, Cologne

Architect: Valentyn Architekten

1.060 m² 2007 - 2008
Stadtwerke Aachen | Municipial Utilities office building jointless drywall ceiling with CTM placed on top Germany, Aachen 151 m² 2011
New office building and warehouse Strabag Düren office building, new construction jointless drywall ceiling with CTM placed on top, plaster on concrete Germany, Düren

Architect: Dirk Niehsen Architektur

638 m² 2020 - 2022
Forschungszentrum Jülich | Research Centre laboratory, refurbishment plaster on gypsum board, plaster on concrete, GRAVIMAT Germany, Jülich 297 m² 2002 - 2003
ELKI Bonn | parent-child-clinic Bonn clinic, new construction gypsum board wall with OPTIPANEL 15 Germany, Bonn

Client: Universitätsklinikum Bonn

26 m² 2017 - 2018
Neuer Markt Ingelheim am Rhein public building, new construction jointless gypsum board ceiling with OPTIPANEL 18 Germany, Ingelheim/Rhein

Architect: Schwinde Architekten, Lieb und Lieb Architekten

2.251 m² 2016
Apollo Theater Siegen public building, new construction plaster on gypsum board Germany, Siegen

Architect: KSP Engel und Zimmermann

351 m² 2007
Pharmacy Bünde public building GRAVIMAT, plaster on concrete, jointless drywall ceiling with CTM placed on top Germany, Bünde 180 m² 2020
Systemhaus Fennel Löhne office building plaster on gypsum board, plaster on concrete Germany, Löhne 1.133 m² 2001
Firma WAGO Kontakttechnik Minden office building, refurbishment jointless drywall ceiling with CTM placed on top Germany, Minden 1.799 m² 2001
Sparkasse Minden | Savings Bank office building, new construction plaster on concrete Germany, Minden 4.638 m² 2003 - 2004
Volksbank Mindener Land Minden office building, refurbishment metal panel, jointless drywall ceiling with CTM placed on top, GRAVIMAT Germany, Minden 1.980 m² 2012 & 2014
Volksbank Mindener Land | Main Office "Am Markt" Minden office building plaster on concrete, jointless drywall ceiling with CTM placed on top Germany, Minden 423 m² 2014 - 2015
Volksbank Mindener Land | Real Estate Lindenstraße Minden office building, new construction jointless drywall ceiling with CTM placed on top Germany, Minden 1.099 m² 2014
WAGO Kontakttechnik Minden office building, new construction metal panel, jointless drywall ceiling with CTM placed on top Germany, Minden 1.578 m² 2015 - 2016
Werner Arzneimittel GmbH Minden office building jointless drywall ceiling with CTM placed on top Germany, Minden 356 m² 2016
Volksbank Mindener Land Lahde office building plaster on gypsum board, metal panel Germany, Lahde-Petershagen 359 m² 2018
Herz- u. Diabeteszentrum NRW Bad Oeynhausen clinic plaster on gypsum board, plaster on concrete Germany, Bad Oeynhausen 366 m² 2000
NRW Children Hospital Bad Oeynhausen clinic plaster on gypsum board, plaster on concrete Germany, Bad Oeynhausen 543 m² 1999
Sparkasse Bad Oeynhausen | Savings Bank office building jointless drywall ceiling with CTM placed on top Germany, Bad Oeynhausen 284 m² 2014 - 2015
Volksbank Schnathorst Hüllhorst office building plaster on gypsum board Germany, Hüllhorst 765 m² 2007 - 2008
Benteler AG Paderborn office building metal panel Germany, Paderborn 4.065 m² 1998
Project Anemonenweg VE Gütersloh residential building jointless drywall ceiling with CTM placed on top Germany, Gütersloh 69 m² 2019
Theater Gütersloh public building plaster on gypsum board, jointless drywall ceiling with CTM placed on top Germany, Gütersloh 776 m² 2009
Modeatelier Pauleikhoff | showroom Rietberg public building plaster on concrete Germany, Rietberg 174 m² 2016
Dr. Oetker Welt Bielefeld office building plaster on gypsum board Germany, Bielefeld 593 m² 2005 - 2006
Kreissparkasse Halle Westfalen | Savings Bank office building jointless drywall ceiling with CTM placed on top, GRAVIMAT Germany, Halle (Westfalen) 1.717 m² 2010-2011
"DreiEins" modern office building Düsseldorf office building, new construction plaster on concrete Germany, Düsseldorf

Architect: Dr. Reiner Götzen Creatives Planen GmbH

1.635 m² 2014
"La Cour" Düsseldorf office building, new construction metal floating ceiling, metal panel Germany, Düsseldorf

Architect: slapa oberholz pszczulny | sop GmbH & Co. KG

3.140 m² 2012 - 2013 & 2020
Ärztehaus Düsseldorf | Medical Centre social and medical institutions plaster on gypsum board, plaster on concrete Germany, Düsseldorf 1.154 m² 2009 - 2010
Businesspark at the airport Düsseldorf office building plaster on gypsum board, plaster on concrete Germany, Düsseldorf 159 m² 2000
Capricornhaus | E.ON Energy Trading Düsseldorf office building, new construction jointless drywall ceiling with CTM placed on top, GRAVIMAT Germany, Düsseldorf

Architect: Gatermann + Schossig

70 m² 2008
E.ON AG Düsseldorf office building, refurbishment plaster on gypsum board, plaster on concrete, GRAVIMAT Germany, Düsseldorf

Architect: Oswald Matthias Ungers

1.211 m² 2007 - 2008
Grafenberger Höfe Düsseldorf office building, new construction plaster on concrete Germany, Düsseldorf

Architect: TCHOBAN VOSS Architekten GmbH

2.733 m² 2007