Project title Building type Heating and cooling system Location Architect/Client CTM surface Year
AIRBUS Deutschland Hamburg laboratory special design Germany, Hamburg 38 m² 2008
AIRBUS Operations Dept. EVCEA I Hamburg laboratory special design Germany, Hamburg 27 m² 2015
AIRBUS Operations Dept. EVCEA II Hamburg laboratory special design Germany, Hamburg 161 m² 2016
Forschungszentrum Jülich | Research Centre laboratory, refurbishment plaster on gypsum board, plaster on concrete, GRAVIMAT Germany, Jülich 297 m² 2002 - 2003
Consolar Solare Energiesysteme Lörrach laboratory ice storage Germany, Lörrach 276 m² 2018
New construction Mikroskopgebäude SALVE + TITAN Ulm laboratory, new construction gypsum board ceiling tile, gypsum board wall with OPTIPANEL 18 Germany, Ulm

Architect: Mühlich, Finke & Partner

Client: Vermögen und Bau Baden-Württemberg

216 m² 2017
Institute of Air Handling and Refrigeration | Dresden laboratory metal floating ceiling Germany, Dresden 107 m² 2010
Cooling microscope room Uni Jena laboratory, refurbishment plaster on gypsum board, brickwork, concrete, plaster on concrete Germany, Jena

Architect: Holger Stertz, Hubert Voigt

Client: Friedrich-Schiller-Universität Jena

30 m² 2013
Cell-based therapy Dr.Neßelhut | Oncology Centre Duderstadt laboratory gypsum board ceiling tile, jointless gypsum board ceiling with OPTIPANEL 15 Germany, Duderstadt 349 m² 2011
Laboratory cooling University Cologne laboratory GRAVIMAT Germany, Cologne 40 m² 2018
Fraunhofer Institute for Silicate Research ISC Würzburg laboratory jointless gypsum board ceiling with OPTIPANEL 25 Germany, Würzburg 313 m² 2012