Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
AIRBUS Deutschland Hamburg | laboratory | special design | Germany, Hamburg | 38 m² | 2008 | ||
AIRBUS Operations Dept. EVCEA I Hamburg | laboratory | special design | Germany, Hamburg | 27 m² | 2015 | ||
AIRBUS Operations Dept. EVCEA II Hamburg | laboratory | special design | Germany, Hamburg | 161 m² | 2016 | ||
Forschungszentrum Jülich | Research Centre | laboratory, refurbishment | plaster on gypsum board, plaster on concrete, GRAVIMAT | Germany, Jülich | 297 m² | 2002 - 2003 | ||
Consolar Solare Energiesysteme Lörrach | laboratory | ice storage | Germany, Lörrach | 276 m² | 2018 | ||
New construction Mikroskopgebäude SALVE + TITAN Ulm | laboratory, new construction | gypsum board ceiling tile, gypsum board wall with OPTIPANEL 18 | Germany, Ulm | Architect: Mühlich, Finke & Partner Client: Vermögen und Bau Baden-Württemberg |
216 m² | 2017 | |
Institute of Air Handling and Refrigeration | Dresden | laboratory | metal floating ceiling | Germany, Dresden | 107 m² | 2010 | ||
Cooling microscope room Uni Jena | laboratory, refurbishment | plaster on gypsum board, brickwork, concrete, plaster on concrete | Germany, Jena | Architect: Holger Stertz, Hubert Voigt Client: Friedrich-Schiller-Universität Jena |
30 m² | 2013 | |
Cell-based therapy Dr.Neßelhut | Oncology Centre Duderstadt | laboratory | gypsum board ceiling tile, jointless gypsum board ceiling with OPTIPANEL 15 | Germany, Duderstadt | 349 m² | 2011 | ||
Laboratory cooling University Cologne | laboratory | GRAVIMAT | Germany, Cologne | 40 m² | 2018 | ||
Fraunhofer Institute for Silicate Research ISC Würzburg | laboratory | jointless gypsum board ceiling with OPTIPANEL 25 | Germany, Würzburg | 313 m² | 2012 |