Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Bleesbrueck Purification Plant | industrial building, refurbishment | heat exchanger | Luxembourg, Bettendorf | 1.345 m² | 2017 - 2018 | ||
Renovation of a cheese dairy Randenhof Sibbling | industrial building, refurbishment | plaster on gypsum board, brickwork, concrete | Switzerland, Sibbling | Client: Privatperson |
74 m² | 2013 | |
Techspace Safran Aero Boosters Milmort | industrial building, retrofit | metal floating ceiling | Belgium, Milmort | 300 m² | 2015 | ||
GSK Glaxo Smith Kline Belgium Healthcare Company Rixensart | industrial building, new construction | metal panel | Belgium, Rixensart | Architect: TPF S.A. Engineers & Architects Client: GlaxoSmithKline |
890 m² | 2013 - 2014 | |
Henry Kruse GmbH IGEFA Neumünster | industrial building, new construction | gypsum board ceiling tile | Germany, Neumünster | Client: Kruse Immobilien GmbH |
1.666 m² | 2016 | |
Exhaust air heat exchanger Conti tyre plant Hannover | industrial building, retrofit | heat exchanger | Germany, Hannover | 472 m² | 2008 | ||
Contex Präzisionstechnik Mönchengladbach | industrial building, refurbishment | metal floating ceiling | Germany, Mönchengladbach | Architect: Wechselberger Bau- und Planungsgesellschaft mbH Client: Meels - Brunnen GbR - 2 |
141 m² | 2016 | |
Vollkornmühle & Bäckerei Myska | Bakery Wuppertal | industrial building, modification | floor heating in screed | Germany, Wuppertal | Architect: IfBW GmbH, Wuppertal Client: private person |
1.184 m² | 2014 & 2018 | |
Heat recovery waste water plant Münster | industrial building | heat exchanger | Germany, Muenster | 62 m² | 2015 | ||
ETA Factory | Model Factory of the Technical University Darmstadt | industrial building | near-surface concrete activation, near-surface concrete activation | Germany, Darmstadt | Architect: Dietz Joppien Planungsgesellschaft mbH |
454 m² | 2015 | |
Baumit-Akademie Bad Hindelang | industrial building, new construction | plaster on gypsum board | Germany, Bad Hindelang | Architect: Stefan Gütt |
218 m² | 2011 | |
Siemens AG Görlitz | Hall 7 Görlitz | industrial building, new construction | jointless drywall ceiling with CTM placed on top | Germany, Gorlitz | 1.545 m² | 2006 - 2007 | ||
VTQ production | Querfurt | industrial building, new construction | near-surface concrete activation | Germany, Querfurt | Client: VTQ Videotronik GmbH |
889 m² | 2004 | |
Production hall cooling TRIBO Immelborn | industrial building, retrofit | cooling roll | Germany, Immelborn | Client: Tribo Hartstoff GmbH |
176 m² | 2008 | |
heat recovery from a stable Gera | industrial building, retrofit | heat exchanger | Germany, Gera | 44 m² | 2008 | ||
LuxAir Cargo Center Niederanven | industrial building | metal panel | Luxembourg, Niederanven | 624 m² | 2007 | ||
Production Jungbunzlauer Austria AG Wulzeshofen | industrial building | metal panel | Austria, Wulzeshofen | 337 m² | 2013 | ||
Production facility ETO Magnetic Wroclaw | industrial building, new construction | plaster on concrete | Poland, Breslau | Architect: AIP Architekten und Ingenieure für Projektplanung Consulting GmbH |
557 m² | 2007 | |
MAN Truck & Bus Niepolomice | industrial building, new construction | plaster on gypsum board | Poland, Niepolomice | 755 m² | 2007 | ||
Lindt & Sprüngli Chocolate factory Kilchberg | industrial building, refurbishment | plaster on gypsum board, plaster on concrete | Switzerland, Kilchberg | 652 m² | 2005 - 2006 | ||
Azterlan Durango Metalurgy Research Center Durango | industrial building | metal panel | Spain, Durango | 928 m² | 2018 | ||
dewatering sewage sludge Bucheon-si | industrial building | heat exchanger | South Korea, Bucheon-si | 2.084 m² | 2017 | ||
meetB Medizintechnik Michendorf | industrial building, new construction | near-surface concrete activation, floor heating in screed | Germany, Michendorf | 998 m² | 2008 | ||
IGEFA Logistikzentrum Laage | industrial building | gypsum board ceiling tile | Germany, Laage | Architect: SAI Scharrer Architekten + Ingenieure |
762 m² | 2012 | |
Kulturwerft Gollan Lübeck | industrial building, refurbishment | ground collector | Germany, Lübeck | 128 m² | |||
ALDI-Fruchtzentrum Mönchengladbach | industrial building | gypsum board ceiling tile | Germany, Mönchengladbach | 576 m² | 2015 | ||
Logistikzentrum Heddesheim | industrial building, new construction | plaster on gypsum board | Germany, Heddesheim | Architect: Krüger Consult GmbH |
1.133 m² | 2012 | |
Engelhardt & Bauer Print and Press Karlsruhe | industrial building | metal floating ceiling | Germany, Karlsruhe | 335 m² | 2005 - 2006 | ||
Fromm Plastics Kölleda | industrial building | metal panel | Germany, Kölleda | 307 m² | 2006 | ||
Calyxo Thalheim | industrial building, new construction | plaster on gypsum board, brickwork, concrete | Germany, Thalheim | Architect: bhss architekten gmbh |
328 m² | 2007 |