Project title Building type Heating and cooling system Location Architect/Client CTM surface Year
Belfius Tower VIP Offices Brussels office building, refurbishment jointless drywall ceiling with CTM placed on top, jointless gypsum board ceiling with OPTIPANEL 15, metal panel, plaster on gypsum board Belgium, Brussels

Architect: Jaspers-Eyers Architects, Samyn and Partners

Client: Belfius Banque

1.620 m² 2014 - 2017 Besprechungsraum mit Gipskartondecke
Dexia Tower Brussels office building, new construction metal panel, plaster on gypsum board Belgium, Brussels

Architect: Jaspers-Eyers Architects, Samyn and Partners

Client: Dexia Group

31.700 m² 2004 - 2006
CURTIUS Museum Liège public building, refurbishment , , new construction plaster on gypsum board, plaster on gypsum board, brickwork, concrete, floor heating onto screed, wooden or drywall subfloor, floor heating in screed Belgium, Liege

Architect: Dethier et Associés

3.127 m² 2007
Pharmacy Masereel Jodoigne residential building, new construction metal panel, floor heating in screed Belgium, Jodoigne

Architect: Bureau d'Architecture J.P. Gallet

Client: private person

128 m² 2014
Techspace Safran Aero Boosters Milmort industrial building, retrofit metal floating ceiling Belgium, Milmort 300 m² 2015
Portes de l`Europe Police Nivelles public building, refurbishment metal panel Belgium, Nivelles

Architect: Samyn and Partners

2.401 m² 2016
GSK Glasko Smith Kline 129 Wavre office building, new construction metal panel Belgium, Wavre

Architect: Assar Architects

Client: GlaxoSmithKline

8.451 m² 2008 - 2009
Law office Scholasse 2+ Wavre office building plaster on gypsum board, metal panel Belgium, Wavre 257 m² 2020
The Gradient, office building Av. de Tervueren 270 Brussels office building, refurbishment metal panel Belgium, Brussels

Architect: Le Corbusier

Client: Confinimmo

1.700 m² 2010 - 2011
Clinique Notre Dame de Grâce de Gosselies clinic, new construction and refurbishment jointless gypsum board ceiling with OPTIPANEL 18, jointless gypsum board ceiling with OPTIPANEL 15, jointless drywall ceiling with CTM placed on top, metal panel Belgium, Charleroi (Gosselies)

Architect: Assar Architects

3.583 m² 2012-2014 & 2018
GSK Glaxo Smith Kline Belgium Healthcare Company Rixensart industrial building, new construction metal panel Belgium, Rixensart

Architect: TPF S.A. Engineers & Architects

Client: GlaxoSmithKline

890 m² 2013 - 2014
Le domaine de Sohan Pepinster residential building, refurbishment plaster on gypsum board, floor heating onto screed, wooden or drywall subfloor Belgium, Pepinster

Architect: Cabinet d'Architectes Paul Hautecler - Pascal Dumont

Client: private person

457 m² 2014
WZC Sint Truiden Villa Rosa assited living social and medical institutions, new construction acoustic plaster ceiling BASWA Cool Belgium, Sint Truiden 532 m² 2014
BelOrta Fruit and vegetables Wavre office building jointless gypsum board ceiling with OPTIPANEL 25 Belgium, Wavre-Sainte-Catherine 325 m² 2014
Cera cVBA Leuven office building acoustic plaster ceiling BASWA Cool Belgium, Leuven 163 m² 2017
SFH Kortestraat Zonhoven residential building floor heating onto screed, wooden or drywall subfloor Belgium, Zonhoven

Client: private person

296 m² 2017
ION Waregem Businesspark office building, new construction plaster on concrete, acoustic plaster ceiling BASWA Cool Belgium, Waregem 325 m² 2018 & 2020
Single-family house GOE Rekem residential building, new construction acoustic plaster ceiling BASWA Cool Belgium, Rekem

Client: private person

229 m² 2018
Administratif Centrum Zuid Gent office building, new construction and refurbishment metal panel Belgium, Gent

Architect: SAR Architekten (BE), Kraaijvanger Architects (NL)

Client: City of Gent

1.626 m² 2020 - 2021
Reconstruction SFH PI Tinlot residential building, refurbishment plaster on concrete Belgium, Tinlot

Architect: Laurent Mahiat, Yves Flament

Client: private person

175 m² 2021
Appartements DO Visé residential building, refurbishment plaster on concrete, plaster on gypsum board, brickwork, concrete, floor heating onto screed, wooden or drywall subfloor Belgium, Visé

Architect: Bureau d'Architectes Stéphan Adam

Client: private person

340 m² 2003
Administrative building of the European Commission Brussels office building, refurbishment metal panel, plaster on gypsum board Belgium, Brussels

Architect: Art & Build

7.302 m² 2006 - 2007
Belfius Tower - CGLSB former Dexia Tower Brussels office building, refurbishment metal panel Belgium, Brussels

Architect: Philippe Samyn and Partners in Kooperation mit M. & J.M. Jaspers – J. Eyers & Partners

1.349 m² 2014
Belfius Tower - National Bank of Belgium Brussels office building, refurbishment plaster on gypsum board Belgium, Brussels

Architect: Philippe Samyn and Partners in Kooperation mit M. & J.M. Jaspers – J. Eyers & Partners

533 m² 2016
CHU Brugman University Hospital Brussels clinic jointless drywall ceiling with CTM placed on top Belgium, Brussels 1.274 m² 2017
European Parliament Brussels office building metal panel Belgium, Brussels 159 m² 2019
Maison Duyck | Hotel Brussels hotel, refurbishment plaster on gypsum board, acoustic plaster ceiling BASWA Cool Belgium, Brussels

Architect: Bureau d'Architecture Philippe Cuylits

Client: M. et Mme Duyck-De Lathauwer

369 m² 2015
Office building "Tour Albert" Square de Meeus 23 Brussels office building, refurbishment metal panel Belgium, Brussels 2.752 m² 2009
Office building Chaussée de la Hulpe 181 Brussels office building, refurbishment jointless drywall ceiling with CTM placed on top Belgium, Brussels 413 m² 2008
Office building City Garden Brussels office building, new construction plaster on concrete Belgium, Brussels

Architect: Atelier d'Art Urbain

4.192 m² 2005 - 2006
Refurbishment MFH Vermeersch Brussels residential building, refurbishment floor heating onto screed, wooden or drywall subfloor Belgium, Brussels 181 m² 2019
Residential building PIR Brussels residential building, refurbishment floor heating onto screed, wooden or drywall subfloor Belgium, Brussels

Client: private person

118 m² 2012
The Gradient, Office building Av. de Tervueren 270 Brussels office building, refurbishment metal panel Belgium, Brussels 7.362 m² 2013 - 2014 & 2016 - 2017
Living Center WZC Zilverlinde Olen social and medical institutions, new construction metal panel Belgium, Olen 536 m² 2015
new office building WI Wilsele office building, new construction acoustic plaster ceiling BASWA Cool Belgium, Wilsele

Client: private person

325 m² 2018 - 2019
Maison RU-DE Uccle residential building plaster on gypsum board Belgium, Uccle

Architect: Aprim Architecture

Client: private person

108 m² 2021
Apartment CO Liège residential building plaster on gypsum board Belgium, Liege

Architect: Cabinet d'Architectes Paul Hautecler - Pascal Dumont

Client: private person

170 m² 2014
Clinique CHC Montlégia Liège clinic, new construction jointless drywall ceiling with CTM placed on top, plaster on concrete Belgium, Liege 13.261 m² 2018 - 2019
Hotel Neuvice Liège hotel, refurbishment plaster on gypsum board, plaster on gypsum board, brickwork, concrete, floor heating in screed, floor heating onto screed, wooden or drywall subfloor Belgium, Liege

Architect: Bureau d'Architectes Stéphane Adam - Michaël Hick

Client: Société HÔTEL NEUVICE

349 m² 2012
House boat Tabl'Onde Liège residential building, refurbishment jointless drywall ceiling with CTM placed on top Belgium, Liege

Client: private person

156 m²
Office building Espace Guillemins Liège office building jointless drywall ceiling with CTM placed on top Belgium, Liege 4.011 m² 2006 - 2007
Residential building WI St. Vith residential building floor heating in screed Belgium, St. Vith

Client: private person

171 m² 2011
Residential building KL Antwerpen Antwerpen residential building, refurbishment floor heating in screed Belgium, Berchem (Antwerpen)

Client: private person

271 m² 2012
Residential building SA Hanlanzy residential building, refurbishment floor heating in screed Belgium, Halanzy

Client: private person

111 m² 2012