Project title Building type Heating and cooling system Location Architect/Client CTM surface Year
Von Ardenne GmbH Dresden | New Construction office building, new construction plaster on concrete, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top Germany, Dresden 1.423 m² 2013 - 2014
Von Ardenne GmbH Dresden | Renovation office building, refurbishment plaster on concrete, jointless drywall ceiling with CTM placed on top Germany, Dresden 1.185 m² 2007 & 2009
Sparkasse Bautzen |Savings Bank office building, refurbishment jointless drywall ceiling with CTM placed on top Germany, Bautzen 294 m² 2010
Renovation Urban Villa Leipzig office building, refurbishment jointless gypsum board ceiling with OPTIPANEL 15 Germany, Leipzig 652 m² 2008
Otto Bock HealthCare GmbH Königsee office building gypsum board ceiling tile Germany, Königsee 326 m² 2011
Trade school centre Vogtland Rodewisch public building jointless drywall ceiling with CTM placed on top Germany, Rodewisch 102 m² 2003
Archiv Potsdam public building, refurbishment jointless gypsum board ceiling with OPTIPANEL 18 Germany, Potsdam 307 m² 2014
Hasso Plattner Institute | extension building Potsdam public building, new construction jointless gypsum board ceiling with OPTIPANEL 15 Germany, Potsdam 479 m² 2010
The Brandenburg main state archive Potsdam public building, new construction jointless gypsum board ceiling with OPTIPANEL 18 Germany, Potsdam 444 m² 2015
New administrative building SWN Neuss office building, new construction plaster on concrete, jointless gypsum board ceiling with OPTIPANEL 18 Germany, Neuss

Architect: Heinle, Wischer und Partner Freie Architekten

Client: Stadtwerke Neuss

2.008 m² 2019
Lankes city cleaning| Brüggen office building, new construction gypsum board ceiling tile, jointless gypsum board ceiling with OPTIPANEL 15 Germany, Brüggen

Client: Lankes Entsorgung und Städtereinigung

146 m² 2017
refurbishment single-family house Ludwigshafen residential building, refurbishment jointless drywall ceiling with CTM placed on top, floor heating in screed, plaster on gypsum board, brickwork, concrete Germany, Ludwigshafen

Architect: Daniel Fischer Ludwigshafen

Client: private person

152 m² 2021
Office Greenwell Design & Build Cairo office building, refurbishment plaster on concrete, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top, GRAVIMAT Egypt, Cairo

Client: Greenwell Design & Build

123 m² 2022