Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
ALB 10 Züblin corporate headquarter Stuttgart | office building, new construction | plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Stuttgart | Client: STRABAG Real Estate GmbH |
3.543 m² | 2021 - 2022 | |
Magirus Immbobiliengesellschaft Stuttgart | office building, new construction | plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Stuttgart | Architect: Blocher Partners |
1.914 m² | 2018 | |
Daimler AG building 136 Werk Untertürkheim | office building, refurbishment | gypsum board ceiling tile, jointless drywall ceiling with CTM placed on top, gypsum board wall with CTM | Germany, Stuttgart | 203 m² | 2016 | ||
Daimler Chrysler building 137 Werk Untertürkheim | office building | jointless drywall ceiling with CTM placed on top, metal panel | Germany, Stuttgart | 300 m² | 2004 | ||
Züblin Z3 Stuttgart | office building, new construction | plaster on gypsum board, jointless drywall ceiling with CTM placed on top | Germany, Stuttgart | Architect: MHM architects |
2.142 m² | 2012 |